A custom order moving smoothly is mostly a question of information. This page sets out the sequence and the inputs that keep it on schedule.
The eight stages
- Enquiry and specification
You send what you have: a 2D or 3D drawing, a physical sample, or a detailed written description with dimensions, material, finish and quantity.
- Feasibility review and quotation
We review the design against our process capability, flag anything that cannot be held to tolerance, and quote with lead time. This is where manufacturability problems are cheapest to fix.
- Sampling
We produce a small number of samples - typically one to five pieces - for fit, finish and colour approval. Sampling charges apply and are confirmed before we start.
- Sample approval
You approve the sample, or send corrections. Anything agreed here becomes the reference for the production run.
- Tooling and first article
Fixtures and programs are set up for the design, and a first article is inspected against the approved sample and the specification.
- Bulk production
The run proceeds with in-process inspection at defined stages. Any deviation from the approved sample is raised with you before further work.
- Final inspection and reporting
Completed parts go through final inspection. Inspection records, material certificates and applicable test reports are compiled.
- Packing and shipping
Parts are packed to the agreed specification and shipped. Packing lists and documentation accompany the shipment.
What to send us at the enquiry stage
- A drawing - 2D is workable, 3D is better - or a physical sample
- Dimensions with tolerances, not just nominal dimensions
- Material and grade, stated explicitly (for example 316L per ASTM A276)
- Surface finish and, if coated, the colour reference
- Quantity, including any size or colour split
- Target market, and any compliance requirement that comes with it
- Packaging requirements - plain poly bag or retail-ready card
Lead time
Lead time depends on the number of operations, whether new fixtures are needed, and the coating queue. Sampling is usually the longest single stage because it involves producing, finishing and shipping a physical object for your approval. Once a sample is approved, bulk production is predictable - which is another reason to settle the sample properly rather than rushing it.
Need this specified for your order?
Send us your drawing, sample or technical requirement. We will confirm feasibility, tolerances and price in writing before production.