MOQ is one of the first questions buyers ask and one of the least well explained. This page sets out our minimums, the reasoning behind them, and what actually moves the unit price.
Our minimum order quantities
| Order type | MOQ | Notes |
|---|---|---|
| Standard catalog designs | 100 pcs per design | Mixed sizes and colours count toward the same design |
| Custom / OEM designs | 360 pcs per design | First run includes fixture and tooling setup |
| Sampling | 1–5 pcs | For fit, finish and colour approval; sampling charges apply |
One unit is one piece for bracelets, necklaces, rings and pendants. Earrings are the exception: one unit is one pair, and earring prices are quoted per pair.
Quantities below the stated minimum can sometimes be accommodated, but they are quoted as sampling rather than as production, and the unit economics reflect that.
Why a minimum exists at all
- Setup cost - fixture design, machine programming and first-article inspection happen once per design regardless of run size
- Batch coating - PVD parts are coated in chamber loads; a minimum load is needed for the run to be economical and consistent
- Finishing lines - polishing and tumbling have practical minimum batch sizes
- Inspection overhead - quality control cost per batch is largely fixed, so it weighs far more heavily on small runs
How unit price is built
Unit price is a function of material, machine time, finishing labour, coating, packaging and inspection. Quantity affects the setup and machine-time components most, because those are amortised across the run.
What moves the price
- Material - 316L cost tracks nickel and molybdenum markets and changes month to month
- Complexity - number of operations and tightness of tolerances drive cycle time
- Finish - mirror polishing is the most labour-intensive; it cannot be rushed without visible loss of quality
- Coating - colour, coverage and whether masking is required for partial coating
- Packaging - individual poly bag against custom carded retail packaging is a real cost difference at volume
Ordering and payment
- No online payment is collected on this website
- Orders proceed by enquiry, then written order confirmation, then payment terms agreed per order
- Terms, lead time and acceptance criteria are confirmed in writing before production begins
Need this specified for your order?
Send us your drawing, sample or technical requirement. We will confirm feasibility, tolerances and price in writing before production.
Request a Quote