Every question we get asked before an order - what grade, what coating, what test, what minimum - answered in the open. Use these when specifying, auditing or comparing suppliers.
Materials & compliance
Materials316L vs 304 Stainless SteelWhat molybdenum changes, why it matters for skin contact, and when 304 is still the right call.ComplianceNickel Release StandardsThe EU framework for piercing and skin-contact items, the test methods, and what can make a part fail.ComplianceEU REACH ComplianceOur declaration of compliance, covered products and restricted-substance screening.
Coatings & finishes
CoatingsPVD Coating ExplainedHow physical vapour deposition works on 316L, how it is tested, and how to care for it.CoatingsPVD vs ElectroplatingDry vacuum process against wet chemistry - performance, waste and when each makes sense.CoatingsPlating Thickness, DecodedMicrons, microinches and the total-film trap. How to read a coating report properly.
Sourcing & production
SourcingMOQ & Pricing ExplainedWhere our minimums come from and what actually drives unit price on a machined jewelry order.SourcingOEM vs ODMWho owns the design, who carries the tooling risk, and which model we operate.ProductionFrom Drawing to BulkThe eight stages between an enquiry and a shipped order, and what we need from you at each.ProductionQuality Control ProcessIncoming, in-process and final inspection - what is checked, with what, and how it is documented.
Product knowledge
ReferenceChain Types ExplainedCuban, rolo, figaro, box, paperclip and rope - structure, character and what each costs to make.ReferenceCare & StorageWhat keeps 316L looking right for years, and the handful of habits that quietly ruin it.
How to use these guidesIf you are specifying an order, start with the material and coating guides, then the MOQ guide. If you are auditing a supplier, the quality control and nickel release guides list the documentation you should be asking for.
Need this specified for your order?
Send us your drawing, sample or technical requirement. We will confirm feasibility, tolerances and price in writing before production.
Request a Quote